- What a cubic yard actually is
- A cube three feet on each side: 3 times 3 times 3, which is 27 cubic feet. That is 46,656 cubic inches, 0.7646 cubic metres, and about the volume of a standard household bath filled nine times. Poured into a pile it is roughly 3 ft high and 5 ft across at the base, which is worth picturing before you have one dropped on your drive.
- Density by material, in pounds per cubic yard
- Mulch 400 to 800, compost 800 to 1,300, topsoil 1,800 to 2,200, fill dirt 2,000 to 2,700, asphalt millings 2,300 to 2,700, crushed limestone 2,500 to 2,900, gravel and crushed stone 2,300 to 2,900, river rock 2,400 to 2,900, sand 2,600 to 3,000, concrete 3,600 to 4,050. Every one of those is a range because source, screening and moisture all move it. The tool prints the range beside the density field and lets you type the number off your supplier's spec sheet.
- Coverage from one cubic yard, by depth
- 324 sq ft at 1 in, 162 at 2 in, 108 at 3 in, 81 at 4 in, 54 at 6 in, 40.5 at 8 in and 27 at 12 in. The rule behind the table is coverage equals 324 divided by the depth in inches, which falls out of 27 cubic feet spread one inch thick. Going the other way, cubic yards equals square feet times depth in inches divided by 324.
- Truck capacities, and which number is the real limit
- A single axle dump truck carries about 5 yards, a tandem about 10, a tri axle about 14. Those are volume figures and they hold for light material. For stone and wet soil the legal axle weight caps the load first, which is why a tandem rated at 10 yards of mulch may only be allowed 6 or 7 yards of gravel. Ask the yard how many yards of your material they put on the truck, not how big the truck is.
- Pickups and payload
- Bed volume is about 2.2 cubic yards for a standard 8 ft bed level with the rails, and roughly 1.5 for a 6 ft short bed. Payload is what actually stops you: near 1,500 lb for a half ton, 3,000 for a three quarter ton and 4,000 for a one ton, though the sticker in the door jamb is the only figure that applies to your truck. In practice that is 2.5 yards of mulch, three quarters of a yard of topsoil or about half a yard of wet sand for a half ton.
- Bag sizes, and turning a bag price into a yard price
- Retail bags run 0.5 cu ft for sand and stone, 0.75 for topsoil, 1 and 1.5 for garden soil and compost, and 2 or 3 for the lighter landscape materials. The rule is always the same: a cubic yard is 27 cubic feet, so divide 27 by the size on the label to get bags per yard, then multiply by the bag price before you compare it with anything quoted per yard. That single conversion is what makes a shelf price and a delivered price comparable. For bagged mulch specifically, where the bag count, the crossover against bulk and the layer already on the bed all interact, the mulch calculator does the whole comparison. This page keeps generic volume, hauling and multi-material orders; for a sand order specifically, where the depth depends on the job and paver bedding, joint sand, play sand and a pool base are four different purchases, the sand calculator works it out by the job.
- A retaining wall is heavier than anything else in this list
- Landscape orders are usually one material, and a retaining wall is four at once: block, cap, compacted base gravel and clean drainage stone. A 40 ft wall standing 3 ft above grade comes to about 10,100 lb of block and cap plus 8 tons of aggregate, roughly 13 tons in total, which is eighteen round trips at a 1,500 lb half ton payload. That is the number that decides whether the project is a weekend of hauling or one delivery, and it is why the answer is almost always delivery. This page keeps the truckload, payload and delivery math; the retaining wall calculator works out which four materials a specific wall needs and what each of them weighs.
- Wheelbarrows, and why the number is not what the barrow says
- A contractor barrow is stamped 6 cubic feet, which would be 4.5 loads to the yard. Nobody fills one level to the brim with wet soil and then pushes it up a plank, so a realistic fill is two thirds, which is 4 cubic feet and about 7 loads a cubic yard. A 3 yard delivery is 21 barrow runs. That is not a reason to order less, but it is a reason to get the pile as close to the work as the truck can reach.
- Swell and shrink, the two corrections that pull opposite ways
- Dig soil out and it swells: 1 cubic yard of ground becomes about 1.25 yards of loose spoil in the truck, so the skip is always bigger than the hole. Put fill back and it shrinks: 1.2 yards of loose fill compacts into 1 yard of hole. Excavation quotes use the swelled figure and fill orders use the compacted one, and they are the same soil.